OPERATING AND MAINTENANCE MANUAL
DEEP SUCTION ELECTRIC PUMP
3. INSTALLATION
5.
4.
2.
1.
Ejector installation:
•
Screw the venturi part (4) into the ejector connection (3) containing the nozzle (2).
•
Connect the brass protective tube (5) on top of the venturi.
•
Finally fit the check valve (1) together with a brass counter-threaded plug (not included).
3.
Accessories
1. Foot valve
2. Nozzle
3. Ejector
4. Venturi
5. Protective tube
9