b.Insert the metal tube together in the bottom of the playard as shown,
MAKE SURE tubes are connected before installing the foldable mattress.
(Fig.6-3) Slip the foldable mattress into the bottom of the bassinet. (Fig.6-4)
Fig.6-5
Press the buttons on both sides of the playpen, and move the top rail
down.(Fig. 6-5)
Fig.6-7)
Note
The lifting function of the playpen must be operated on both sides of the bed.
06
Fig.6-6
Fig.6-7
STEP 4: Diaper changer assembly
a.Unfold the diaper changer.
b.Insert the two tubes inside the diaper changer as shown.
securely attached to the top short rails.
When you put you baby on the diaper changer, Always use the harness
to keep your baby in safe.
Storage assembly
Attach the clips of the storage to the top rail.
07