CHECK TO BE CARRIED OUT WHEN THE INSTALLATION IS COMPLETE
LIFT MODEL......................................................................................... SERIAL NO.........................................
1. CHECKING CORRECT INSTALLATION AND SEALING CAPACITY OF SCREW SECURING LIFT TO FLOOR
2. CHECKING CORRECT ELECTRIC HOOK-UP (ACCORDING TO STANDARDS)
3. CHECK OF CORRECT OPERATION (ACCORDING TO MANUAL)
4. CHECK FOR CORRECT EMERGENCY PUSH-BUTTON OPERATION
5. CHECK FOR MAX HEIGHT MICRO-SWITCH OPERATION
6. CHECK FOR MIN HEIGHT MICRO-SWITCH OPERATION
7. CHECK FOR SAFETY MICRO-SWITCH OPERATION TO PREVENT
ACCIDENTAL CARRIAGE MISALIGNMENT
8. CHECK FOR SMOOTH MOVEMENT AND LUBRICATION (GREASE) OF ROPE OF CARRIAGE MISALIGNMENT
SAFETY DEVICE
9. CHECK FOR CORRECT TENSION AND LUBRICATION (GREASE) OF DRIVING CHAIN AND PINIONS
10. CHECK FOR CARRIAGE GUIDE SLIDER LUBRICATION (GREASE)
11. CHECK FOR ARM-LOCK CORRECT ENGAGEMENT
12 CHECK FOR FOOT GUARDS CORRECT ASSEMBLY
13. CHECK FOR DRIVING BELT CORRECT TENSION
14. FULL-LOAD LIFT TESTING
15. CHECK OF LABEL APPLICATION ACCORDING TO DIAGRAM
16. CHECK FOR DOCUMENTS (instruction manual, Declaration of Conformity and inspection records)
17. TRAINING OF THE PERSONNEL AUTHORISED TO USE THE LIFT
18. INSPECTION RECORDS FILLING OUT
NOTE
Firma Tecnico installatore
DATE
______________/_____________/________
RESERVED TO THE INSTALLER
User
Stamp and Signature
Firma cliente
Installer
Stamp and Signature