JOST KKS-U Instrucciones De Montaje Y Funcionamiento página 78

Idiomas disponibles
  • ES

Idiomas disponibles

6
Installation
Figure 37: Cable clamp
1 Pneumatic
brake cable (yellow)
2 Pneumatic
supply line (red)
A Electric cable,
15-pin (power/lighting)
78
B Electric cable, 7-pin (EBS)
C Electric cable, 4-pin (Modul E-
Drive landing gears)
D Electric cable, 4-pin (power
cable, 4x6 mm
)
2
MUB 007 004 M01 (REV--) 05-2023
ATTENTION!
The cable clamp assignment may differ from Figure 37
due to the existing design. Before laying electric cables
and pneumatic hoses, check which line/cable you are
dealing with. Pneumatic hoses have coloured markings
at the ends (yellow = brake, red = supply). The electric
cables can be identified by their cross-sectional area and
the number of wires.
Route pneumatic hoses 1 and 2 towards the rear of the semi-
trailer to the valve unit.
Route electric cables A and B on the
front wall of the semi-trailer.
Route electric cable C towards the rear of the semi-trailer so
that it can be connected to the landing gear cable later on.
The auxiliary supply cable D is only required if it is needed to
supply power to additional units, such as a tail lift, for exam-
ple. If it is not needed, properly isolate the cable and secure it
in the chassis.
loading