5.2
Installing the device
NOTE!
The specified oscillation and vibration resistance can only be guaranteed if the device is fixed properly.
It is fixed, for example, through the four drilled holes on the bottom of the device.
Requirements:
Medium circulation in the plant is stopped.
The plant pipeline is emptied and flushed.
Aids:
Suitable tools
Lubricating paste
For thread connections: 2 suitable pipe adapters (pipe adapters are available from JUMO on re-
quest)
For thread connections: suitable sealing material depending on pipe adapter
For Tri-Clamp connections: 2 Tri-Clamp clamps
2 seals (for variant with threaded connection, the seals are included in the scope of delivery)
Procedure:
Thread connection (DIN EN ISO 228-1)
1. Lubricate the threads of the process connections (4) and the pipe adapters (2) with lubricating paste.
2. Screw the pipe adapters (2) into the pipelines (1).
3. Make sure that the connections are tight.
4. Insert one seal (3) each into a pipe adapter.
5. Insert the device (5) according to the marked flow direction (→).
6. Screw the pipe adapters (2) hand-tight to the process connections (4).
7. Tighten the two adapters (2) in opposite directions.
Tightening torque DN 6: 15 Nm
Tightening torque DN 15 to DN 25: 30 Nm