Mobilization; Unpacking; Installation Space - Butler KENDO.30LIGHT Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

6.0

MOBILIZATION

If the machine has to be moved from its normal work
post, the movement must be conducted following the
instructions listed below.
Fig. 4
• Protect the exposed corners with suitable material
(Pluribol/cardboard).
• Do not use metallic cables for lifting.
• Sling with belts long at least 450 cm and with a ca-
pacity load greater than 2500 kg.
Then carry out the lifting using the bracket (Fig. 4
pos. 1).
7.0

UNPACKING

The cardboard box is supported with plastic strapping.
Cut the strapping with suitable scissors.
Use a small knife to cut along the lateral axis of the box
and open it like a fan.
It is also possible to un-nail the cardboard box from the
pallet it is fixed to.
After removing the packing, and in the case of the ma-
chine packed fully assembled, check that the machine is
complete and that there is no visible damage.
If in doubt do not use the machine and refer to profes-
sionally qualified personnel (to the seller).
The packing (plastic bags, expanded polystyrene, nails,
screws, timber, etc.) should not be left within reach of
children since it is potentially dangerous.
These materials should be deposited in the relevant col-
lection points if they are pollutants or non biodegradable.
INSTRUCTION, USE AND
MAINTENANCE MANUAL
8.0
The location of the machine requires a usable space of
3250x2750, mm (as indicated in Fig. 5).
The positioning of the machine must be according to the
distances shown. From the control position the opera-
tor is able to observe all the machine and surrounding
area. He must prevent unauthorized personnel or ob-
jects that could be dangerous from entering the area.
The machine must be fixed on a flat floor surface, pref-
erably of cement or tiled.
Avoid un-solid or irregular surfaces.
The base floor must be able to support the loads trans-
mitted during operation.
This surface must have a strength of at least 500 kg/m
The thickness of the solid floor must be sufficient to
guarantee that the anchoring bolts hold.
Page 28 of 106
KENDO.30LIGHT-KENDO.30LIGHTFI
THE BOX CONTAINING THE AC-
CESSORIES IS CONTAINED IN
THE WRAPPING. DO NOT THROW
IT AWAY WITH THE PACKING.

INSTALLATION SPACE

Fig. 5
7105-M002-0_B
GB
.
2
Tabla de contenido
loading

Este manual también es adecuado para:

Kendo.30lightfi

Tabla de contenido