7 START-UP
The start-up phase is very important to ensure maximum security and compliance to regulations, including all the requirements of
EN 12445 standard which establishes the test methods for testing the automation for gates.
DEA System reminds that all installation, maintenance, cleaning or repair operations on any part of the system must be performed
exclusively by qualified personnel who must be responsible of all texts requie by the eventual risk;
7.1 Installation test
The testing operation is essential in order to verify the correct installation of the system. DEA System wants to summarize the
proper testing of all the automation in 4 easy steps:
• Make sure that you comply strictly as described in paragraph 2 "WARNINGS SUMMARY";
• Test the opening and closing making sure that the movement of the leaf match as expected. We suggest in this regard to perform
various tests to assess the smoothness of the gate and defects in assembly or adjustment;
• Ensure that all safety devices connected work properly;
• Perform the measurement of impact forces in accordance with the standard 12445 to find the setting that ensures compliance
with the limits set by the standard EN12453.
WARNING Using spare parts not indicated by DEA System and/or incorrect re-assembly can create a risk to people, animals
and property and also damage the product. For this reason, always use only the parts indicated by DEA System and scrupulously
follow all assembly instructions.
7.2 Unlocking and Manual operation
In the event of malfunctions or simple power failure, release the motor (Pic. 8) and perform the operation manually.
The knowledge of the unlocking operation is very important, because in times of emergency the lack of timeliness in acting on
such a device can be dangerous.
WARNING The efficancy and safety of manual operation of the automation is guaranteed by DEA System only if the installation
has been installed correctly and with original accessories.
8 MAINTENANCE
Good preventive maintenance and regular inspection ensure
long working life. In the table below you will find a listo f inspec-
tions/maintenance operations to be programmed and executed
periodically.
Consult the TROUBLE-SHOOTING" table whenever anoma-
lies are observed in order to find the solution to the problem and
contact DEA System directly whenever the solution required is not
provided.
Description
The chain is noisy.
The operator does not start.
After learning the opening/closing position
the operator does not start.
Door doesn't close.
Push-button works properly, while the re-
mote does not.
Transmission distance is too short.
14
Chain and rotating joints lubrication
TROUBLE-SHOOTING
Causes
Chain is not sufficiently in tension.
The power plug is not properly inserted or
the fuse is damaged.
The track fixing screws are not properly
tightened or some errors occurred during
the learning procedure.
The "photocell" function is activated.
The remote has not been learnt or battery
is low.
The remote battery is low.
INTERVENTION TYPE
Check screws screwdown
Check chain tension
Possible solutions
Properly adjust the tension of the chain by
tightening the M8 nut (Pic. 5).
Check the correct insertion of the power
plug or replace the fuse.
Tighten the track fixing screws or repeat the
operator learning procedure of the stroke.
Deactivate the "photocell" function.
Learn the remote or replace the battery.
Replace the remote battery.
PERIODICITY
6 months
6 months
6 months