ELECTRIC WIRING
10.2.1 Setting of DIP Switches for Outdoor Unit
Quantity and Position of DIP Switches
The location is as follows:
RAS-(4-6)H(V)NC1E
DSW1: For Test Run
Factory setting
DSW2: Optional Function Setting
Factory setting
Piping length ≤ 5m
Piping lenght ≥ 30m
Control to support existing pipes or when using
Ø19,05 gas pipe (soft-annealed), switch ON
DSW2 pin 4 in the outdoor unit PCB
Optional function setting mode (The optional
function selection mode become available)
External input/output setting mode (The input
/ output signals selection mode becomes
avaliable).
15
PMML0395B rev.0 - 11/2015
All manuals and user guides at all-guides.com
Factory setting
Factory setting
(Setting for the ten digit).
Factory setting
(Setting for the last digit).
Factory setting
Cancellation
In the case that the outdoor units quantity in the same H-LINK
is 2 or more, set No. 1 pin of DSW5 at "OFF" side from the 2nd
refrigerant group outdoor unit. If only one outdoor unit is used,
no setting is required.
For individual operation
(factory setting position)
For IVX series
ON
For simultaneous operation
1 2 3 4 5 6
DSW3: Capacity
RAS-4HVNC1E
RAS-5HVNC1E
ON
ON
1 2 3 4 5 6
1 2 3 4 5 6
RAS-4HNC1E
RAS-5HNC1E
ON
ON
1 2 3 4 5 6
1 2 3 4 5 6
DSW4 / RSW1: Refrigerant Cycle No. Setting
DSW5: Transmission Setting of End Terminal
Resistance
DSW6: Optional function setting
RAS-6HVNC1E
ON
1 2 3 4 5 6
RAS-6HNC1E
ON
1 2 3 4 5 6
0