6.9 Gas burner
Installation must take place in compliance with the local rules and regulations.
Before this unit is started, we recommend carefully reading the instructions attached by the generator
manufacturer.
A check must be made before commissioning units provided with a hot air generator that the gas
distribution system (gas type, available pressure, etc.) is compatible with the control and setup
parameters of the unit.
6.9.1
Installation
In units requiring a hot air generator, this is normally installed at the factory.
The connections to the gas network, the connection of the steam trap and of the flue pipes must be performed by
the installer.
6.9.1.1
Connections
All connections are pre-set in the front part of the equipment.
The connections shown in the figure include:
- A = generator air intake;
- B = front access door;
- C = steam trap;
- E = electrical connections;
- G = gas connection;
- S = fume exhaust.
The figure refers to the connections of one module. Units may however be fitted with two or three modules.
The air intake in the generator is supplied with a grid to prevent the ingress of leaves.
We reserve the right to make changes without any prior notice.
UATYA
4P645202-2
G
A
E
C
S
B
Translation from original instructions
Packaged Rooftop
59