6.2

Installation steps

The manufacturer only assumes liability for parts included in the scope of
delivery. The validity of the warranty expires if the device is installed toge-
ther with third-party parts.
Check whether the roof of the vehicle is able to support the weight of a
person before climbing onto it. Ask the vehicle manufacturer about the per-
mitted roof loads.

6.2.1 Make the roof hatch

➤ Remove all screws and fixtures of the existing sunroof.
➤ Take out the sunroof.
➤ Remove the sealing material from around the opening so that the sur-
Dispose of all waste material, glue, silicone and seals separately. Observe
the disposal guidelines.

6.2.2 Prepare the system

While preparing the system on the work surface, make sure it does not fall.
Make sure that the surface is even and clean so that the system is not da-
maged.
➤ Lay the roof air conditioner on a work surface with the housing facing
➤ Remove the four M8 bolts, spring washers and washers from the four
➤ Place the four spacer sleeves L= 3 mm (see fig. 3 on page 3, Pos. 4)
➤ Stick the 2 m long insulation tape (25 x 10 mm, see fig. 3 on page 3,
All manuals and user guides at all-guides.com
face is clean and free of grease.
downwards.
threaded bolts (see fig. 2 on page 3, Pos. 1).
on the four threaded bolts (see fig. 3 on page 3, Pos. 6).
Pos. 5) into the existing cavity in the system. Apply a plastic, non-har-
dening sealing compound (for example, SikaLastomer-710) to the im-
pact edge and the top edge of the insulation tape.
Installation
27