Magnetic Stirrer (Option) - Xylem SI Analytics CT 72/2 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

3.5.

Magnetic stirrer (option)

Preparations
Insulation of the bath cover B
The insulation reduces condensation of moisture and prevents the
formation of ice on the bath cover.
Insert a measuring stand AVS in each of the two openings and place
it on the bath bottom
or
Immerse manual measurement inserts for viscometers in the opening
and insert viscometers with holders.
Cover the unused openings with the lid.
Lay on insulation for the bath cover.
Lay the metal bath cover on the insulation.
Transparent baths CT 72/2, CT 72 TT, CT 72/4:
When using AVS-measuring stands, each measuring point can be
equipped with a magnetic stirrer later.
On bottom of the bath there are removable covers with leading-in tubes
for the necessary supply cables. These covers are accessible from
below.
70
Tabla de contenido
loading

Este manual también es adecuado para:

Si analytics ct 72/4Si analytics ct 72/2 tt

Tabla de contenido