Result
Prerequisites
Conergy IPG series central inverters
5–2:
Conergy IPG 40K–60K: Connect the AC cables
7. Fit the PE conductor to the PE connection bar (2) with a cable
lug. Please note: only 8.8 strength category screws or higher
should be used.
8. Install the mounting elements on the threaded bolt in the
following order:
a) Cable lug
b) Washer
c) Retaining washer
d) Securing nut
9. Tighten the securing nut (54 Nm).
10. Close the front door.
The grid is connected.
Connecting auxiliary power supply
| A connection to the auxiliary power supply (cable lead single-
phase, 230 V) must be provided by the customer.
Connecting auxiliary power supply
1. Open the front door.
The connections for the auxiliary power supply are located
between the terminal blocks for the grid connection and the solar
generator connection.
2. Connect the three wires (L, N, PE) of the auxiliary power supply
according to the diagram to the terminal block of the auxiliary
supply. Check that the cables are correctly allocated to the
terminals.
Operating manual
5 Installation
(1)
(2)
29