Maintenance Works - Kärcher SB MU Manual Del Usuario

Ocultar thumbs Ver también para SB MU:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Time
Activity
annual
Safety check
Maintenance
Exchange filter
opinion

Maintenance Works

Lubricate the hand-spray gun
1 Screw
2 Halves of the handle shell
3 Node piece
4 Needle bearing
5 O ring
6 Contact surface pipe/ handle shell
7 high pressure hose
 Unscrew spray pipe.
 Loosen 6 screws.
 Remove the half of the handle shell.
 Fill grease in the needle bearing cham-
ber in the handle shell.
 Grease needle bearing and O-Ring.
 Grease contact surface pipe/ handle
shell.
 Screw back the two halves of the han-
dle shell.
Oil change
Danger
Risk of burns due to hot oil or hot parts of
the plant. Allow pump to cool down for 15
minutes before oil change.
Note
Please dispose off used oil only in the col-
lection points provided for them. Please
hand over old oil, if any, only at such plac-
es. Polluting the environment with used oil
is a punishable offence.
62
Assembly affect-
Performance
ed
Entire plant
Safety check according to the guidelines for fluid spraying equipment
/ accident prevention regulations.
Entire plant
Maintenance contract including the replacement of all wear parts.
Filter insert acti-
Close the fresh water stop valve, unscrew and rinse filter cup, re-
vated carbon filter
place filter insert by a new one, reinstall filter insert and filter cup,
RO
open fresh water stop valve, start up plant.
Pump of RO sys-
Inform Customer Service. Check characteristic line (flow quantity
tem
and pressure).
1 Oil container lid
2 Oil drain screw
 Keep a collection basin for old oil ready.
 Remove the lid of the oil container.
 Unscrew the oil drain screw and collect
used oil.
 Insert washer and turn in the oil drain
screw.
 Slowly fill in new oil until the "MAX"
marking on the oil container.
 Close the oil container with the lid.
 Deliver the old oil to the respective col-
lection centres.
Clean the coin mechanism
 Open the coin acceptor, and clean the
coin channel with a moist cloth and
washing liquid.
24
-
EN
Clean sieve in front of the orifice plate
1 Orifice plate with sieve (marked in red)
2 Stop valve anti-freeze
 Close the anti-freeze stop valve.
 Open the screw connection. Clean
sieve. Check orifice plate for free pas-
sage.
 Close screw connection.
 Open the anti-freeze stop valve.
By whom
Customer
Service
Customer
Service
Operator/
Customer
Service
Customer
Service
Tabla de contenido
loading

Este manual también es adecuado para:

1.070-002.0

Tabla de contenido