Maintenance Instructions - Kärcher SB MU Manual Del Usuario

Ocultar thumbs Ver también para SB MU:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

The prerinse of the RO membrane will be
completed in X seconds.
The reverse osmosis produces permeate.
The final rinse of the RO membrane will be
completed in XX seconds.
Permeate production blocked as the base
exchanger is performing a regeneration.
No water pressure at inlet of the system.
Buffer container for permeate filled with
permeate to the level sensor BUFFER
CONTAINER FULL.
Water level in the buffer container for per-
meate is below level sensor BUFFER
CONTAINER FULL.
Water level in the buffer container for per-
meate is below level sensor BUFFER
CONTAINER EMPTY.
Dry run delay active after XXX minutes.
During this period, the SB-C is supplied
with cold water.
The buffer container for permeate is empty,
the SB-C is supplied with cold water.
Operating hours
Here, the operaing hours of the individual
system components since system start-up
are shown.
The different menu items are shown in the
overview at the beginning of this chapter.

Maintenance instructions

The bases of a safe operating of the equip-
ment is thr regularly maintenance accord-
ing to the following maintenance plan.
Use only original parts of the manufacturer
or part suggessted by him, such as
parts and wearing parts,
accessories parts,
operating materials,
cleaning agents.
Danger
Risk of accident while working on the unit.
During all tasks
 Turn off the water supply; close the
fresh water tap,
 First switch-on in voltage-less state,
switch off the emergency stop switch in
the building and secure it against being
switched on again.
Warning
Risk of damage. Never use a high-pressure
jet to clean the inside of the system.
Who may perform maintenance?
Operator
Work designated with the sign "Opera-
tor" may only be carried out by persons
who have been instructed in the safe
operation and maintenance on the
washing system.
Customer Service
Work designated with the sign "Cus-
tomer Service" may only be done by the
fitters of Kärcher Customer Service.
Maintenance contract
In order to ensure a reliable operation of the
plant, we recommend that you conclude a
maintenance contract with us. Please refer
to you local KÄRCHER service depart-
ment.
Danger!
danger of injury because of possible dam-
aged parts of the high pressure jet, danger
of burns because of hot equipment parts..
When working, while the equipment is open
take special care, and obey all safty notic-
es!.
The following parts are possible to be hot-
ter than 50 °C:
cylinder head of the high pressure
pump
high pressure hose
21
-
EN
59
Tabla de contenido
loading

Este manual también es adecuado para:

1.070-002.0

Tabla de contenido