Alignment Guides
6. Install the Bath
NOTE: To provide access for securing the connections, temporarily position block spacers on opposing
ends between the shroud and the bath rim. Position the blocks to avoid damaging the alignment guides
located under the bath rim. The type of alignment guides may vary by product.
With help, carefully lift the bath into place over the shroud and onto the temporary blocks.
For Wireless Music Kit: Refer to the instructions included with the music kit for wiring and
installation details, and make the final electrical connections.
Secure all drain connections and fittings according to the drain instructions.
For a rim-mount faucet, install the faucet and trim according to the faucet and trim instructions.
Make sure there is adequate support under the bath rim to support the faucet. Refer to the "Prepare
the Rim-Mount Faucet (Optional)" section.
Plug the power cord into the installed outlet.
Carefully remove the blocks and make sure the bath rim engages the top of the shroud on all sides.
Ensure all alignment guides are inside the shroud; there should be no gap between the bath and the
shroud.
Install the drain flange and overflow cover according to the drain instructions.
Close the bath drain. Fill the bath to the overflow, and check for leaks.
If desired, apply a thin, continuous bead of clear or color-matched 100% silicone sealant to the seam
between the shroud and the finished floor.
Test Run the Bath
Check all electrical connections and make sure the electrical power to the bath is on.
Operate the user keypad to test the temperature settings.
For additional information on bath operation, refer to the "Operating Instructions" section.
Kohler Co.
9
Temporary
Blocks
1237788-2-G