Kohler K-24002-W1-0 Guía De Instalación Y Cuidado página 6

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Models with Support Blocks
3. Prepare the Bath
NOTICE: Refer to the drain instructions to dry fit the drain to the bath. Do not cement and complete the
drain installation until instructed.
Dry fit the drain assembly to the bath. Refer to the drain instructions. Do not apply sealant or
cement to the drain components at this time.
Loosen the drain and overflow connections from the bath, and remove the drain assembly from the
bath.
Dry fit the drain assembly to the drain pipe, which has already been cut to the correct height.
Temporarily position the shroud in place over the drain assembly.
With help, temporarily lift the bath into place in the shroud. Make sure the bath rim is completely
seated over the shroud to engage the alignment guides.
Verify that the drain and overflow connections line up properly with the drain and overflow holes
on the bath. Measure and record any adjustments needed to the drain or overflow tube lengths.
Remove the bath and shroud, leaving the drain and overflow assembly attached to the drain pipe.
Adjust the length of the drain tubes as needed to ensure drain alignment with the drain and
overflow holes in the bath.
Repeat these drain fit steps until the drain and overflow connections line up with the drain and
overflow holes in the bath.
Cement and assemble the drain and overflow components. Connect the drain tee to the drain pipe.
Apply 100% silicone sealant to both sides of the drain and overflow gaskets.
Apply slow-drying construction adhesive to the bottom of the shroud.
Carefully position the shroud over the drain, aligning the hole with the traced mark on the floor.
1237788-2-G
Dry fit the drain.
Attach to the
drain pipe.
Apply construction adhesive
before final positioning.
6
All Other Models
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-24011-w1-0K-6369-w1-0K24002-w1-0K-6368-w1-0

Tabla de contenido