Start-Up After Prolonged Downtime; Switching On - Speck pumpen BADU Jet perla Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 164
6 Start Up
6.2

Start-up after prolonged downtime

After an extended down- time, the overhang counter swim unit must be
thoroughly checked before it is switched on and connected to the power
supply.
6.3

Switching ON

Prerequisites:
Running dry will damage the pump!
4. Switch the unit on.
If the pump in the unit has a three-phase motor and is running in the
wrong direction, this can normally be detected as the unit runs louder
and pumps less.
5. For three-phase motors: make sure that the motor is running in the
6. Check the mechanical seal.
52 EN
VG 766.2330.061
Insert a screwdriver into the slot on the end of the motor shaft (fan
side) and turn it.
If there is no slot on the motor shaft, remove the fan cover and turn
the fan wheel manually in the direction of rotation.
Unit must be filled with water
Cover on
Ventilate the pump and the suction line.
direction of the adhesive arrow. If the rotational direction is wrong,
report this to a certified electrician. Check using the directional ar-
row on the fan cover.
05/2013
Tabla de contenido
loading

Este manual también es adecuado para:

Badu jet rivaBadu jet stella

Tabla de contenido