5 Installation
5.4
Additional parts required
The following parts are not included with the unit and must be provided
for before installation on site.
50 EN
VG 766.2330.061
In the event of an emergency, an Emergency Switch in accordance
to DIN EN 809 must be provided for.
Earth leakage switch I
Fuse 16 A -slow blow 230 V and 400 V.
Emergency switch – disconnects all phases.
30 mA.
N
05/2013