Monthly Preventive Maintenance Checklist - Alliance Laundry Systems HC18 Instalación/Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Maintenance
Machine ________________________
Operator _______________________
Disconnect power to the machine before performing the monthly maintenance procedures.
1. For 80-pound capacity models only: Each month OR after every 200
hours of operation, lubricate bearings and seals.
2. Determine if V belt(s) require replacement or adjustment:
a. Check each V belt for uneven wear and frayed edges.
b. Verify that each V belt is properly aligned.
c. For 3-speed models only: Verify that each V belt is properly
tensioned.
3. Remove back panel and check hoses for leaks.
4. Unlock the hinged lid and check supply dispenser hoses and connections.
5. Clean inlet hose filter screens. Replace if worn or damaged.
6. Tighten motor mounting bolt locknuts and bearing bolt locknuts, if
necessary.
7. Use compressed air to clean lint from motor.
8. Clean interior of machine, both basket and shell, by wiping with a water-
soaked sponge or cloth.
9. Use compressed air to clean moisture and dust from all electrical
components.
10. For variable-speed machines only: Clean AC drive cooling fan blades
with a dry cloth.
11.
12.
13.
14.
68

Monthly Preventive Maintenance Checklist

Checks
Observe All Safety Warnings!
Month
F232062

Capítulos

Tabla de contenido
loading

Tabla de contenido