Daily Preventive Maintenance Checklist - Alliance Laundry Systems HC18 Instalación/Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Maintenance
Machine ____________________________
Operator ___________________________
1. Inspect water inlet valve hose connections on the back of
the machine for leaks.
2. Inspect steam hose connections for leaks (where
applicable).
3. Verify that insulation is intact on all external wires and
that all connections are secure.
4. Check door lock and interlock before starting operation:
a. Attempt to start the washer with door open.
b. Close the door without locking it and attempt to start
the washer.
c. Close and lock the door, start a cycle, and attempt to
open the door while the cycle is in progress.
5.
1. Clean the door gasket of all foreign matter.
2. Clean automatic supply dispenser and lid.
3. Clean the washer's top, front, and side panels.
4. Leave loading door open at the end of each day to allow
moisture to evaporate.
5.
6.
Note: Unload the machine promptly after each completed cycle to prevent moisture buildup.
Note: Leave loading door open after each completed cycle to allow moisture to evaporate.
66

Daily Preventive Maintenance Checklist

Checks
Observe All Safety Warnings!
Beginning of Day
End of Day
Week Of: ________________
Days
1
2
3
4
5
6
7
F232062

Capítulos

Tabla de contenido
loading

Tabla de contenido