Concrete Foundation Pad - Alliance Laundry Systems HC18 Instalación/Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Figure 32
Note: Check and retighten the locknuts after
five to ten days of operation and every three
months thereafter.
Figure 33 shows the completed J-bolt
installation with grout.
Machine
Base
Locknut
Figure 33
F232062
A concrete foundation pad may be constructed
to elevate the machines. See Figure 34 for a
typical concrete foundation pad installation.
Note: Expansion bolts should not be used
in single-machine concrete foundation
pad installations.
H033I
1/2 in. (13 mm)
Machinery
Grout
J-Bolt
H034IE1A
Installation

Concrete Foundation Pad

1. Verify that the floor is 3500 psi minimum
reinforced concrete embedded in clean,
compacted fill dirt. For 2-speed models,
the floor must be at least 4 inches
(102 mm) thick. For 3-speed and variable-
speed models (except for the 80-pound
capacity model), the floor must be at least
6 inches (152 mm) thick. For 80-pound
capacity models, the floor must be at least
9 inches (229 mm) thick.
2. Break up and excavate the floor to a depth
of approximately 9 inches (230 mm)
below the floor surface, making certain
that the sides of the hole slope outwards
from top to bottom.The bottom of the hole
should be 5 inches (127 mm) larger all
around than the top.
Note that when installation is complete,
the top of the pad should extend a
minimum of 4 inches (102 mm) out from
the machine on all sides.
3. Wet the hole well and brush the bottom
and sides with cement grout.
39

Capítulos

Tabla de contenido
loading

Tabla de contenido