C
Modelo
GIA-MAB-O-05Y01
GIA-MAB-O-09Y01
GIA-MAB-O-12Y01
GIA-MAB-O-16Y01
3.Installation
3.1 Unpacking and Inspection
When the equipment is received, all items should be carefully checked according to the packing
list to ensure all cartons have been received. Move units in the normal "up" orientation as indicated
by the arrows on each carton. Examine cartons for shipping damage, removing the units from the
cartons if necessary. If the unit is damaged, the carrier should make the proper notation on the
delivery receipt acknowledging the damage.
3.2 Safety Considerations
VERY IMPORTANT: Never install your air conditioner in the bilge or engine room areas. Ensure
that the selected location is sealed from direct access to bilge and/or engine room vapors. Do
not terminate condensate drain line within 3' (914mm) of any outlet of engine, generator exhaust
system, compartment housing an engine or generator, or in a bilge, unless the drain is connected
properly to a sealed condensate or shower sump pump. Seal all cabin sole penetrations around
condensate hoses to eliminate harmful bilge fumes in the cabin living spaces.
Installation and servicing of this system can be hazardous due to system pressure and
electrical components. When working on this equipment, always observe precautions described
in the literature, tags and labels attached to the unit. Follow all safety precautions. Wear safety
glasses and work gloves and place a fire extinguisher close to the work area. The following is a
summary of the labels on the unit:
A
A
B
309
324
411
324
409
370
478
365
Aire acondicionado para barcos y yates
C
D
E
440
91.5
457
16
458
119.4
488
3
F
G
H
40
80
45
102
40
35
107
40
102