Electric Box Installation; Installation Checklist (Review Prior To Installation) - Giatsu GIA-MAB-O-05Y01 Manual De Usuario E Instalacion

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Aire acondicionado para barcos y yates

3.14 Electric Box Installation

Mount the electric box using four M5 screws.
Mount the electric box in a cool dry location and leave plenty of room for maintenance.

3.15 Installation Checklist (Review Prior To Installation)

3.15.1 Seawater cooling system:
Speed scoop located as far below the water line and as close to the keel as possible
Shut off valve (sea cock) and speed scoop properly sealed and tightened
Seawater pump is at least 1' (305mm) below water line and securely mounted
Strainer mounted below pump with access to filter
Double/reversed stainless steel hose clamps on all hose connections
Teflon tape on all threaded connections
Hose runs uphill from speed scoop and sea cock to strainer, pump and a/c unit, then downhill
(if possible) from a/c unit to overboard discharge
Water flowing freely from overboard discharge while pump is running
Pump relay panel, if used, must have its own circuit breaker sized for the pump (20 amp max)
All metal fittings should be bonded
3.15.2 Mounting
Not in engine room or bilge area, must be sealed away from exhaust or fumes
Proper spacing allowed around unit
Attached to solid level platform with hold down brackets provided
Condensate drain routed aft and down hill to a sealed sump (not bilge)
All penetrations to bilge area sealed
Blower rotated toward supply air grille
3.15.3 Electrical
All butt connections on pumps are tightly crimped and covered with heat shrink
12
Tabla de contenido
loading

Este manual también es adecuado para:

Gia-mab-o-09y01Gia-mab-o-12y01Gia-mab-o-16y01

Tabla de contenido