Carlo De Giorgi SURGERY PLUS Manual De Instrucciones página 34

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
Inspect the unit for damages during transport. The claims for possible damages
will be accepted only in case they are immediately communicated to the carrier;
the damages that are found must be written down and presented to LED SpA or
to your own retailer. If the unit is returned to the LED SpA or to your own retailer,
it is necessary to use the original equipment's package or another equivalent
one, to guarantee the safety during the transport.
Unpack the equipment and carefully study the documentation and operating in-
struction supplied. Mains voltage, indicated above the inlet, must agree with the
local mains voltage (mains voltage frequency: 50-60 Hz). The correct voltage
(see above) setting is selected as shown in fig. E. Insert the correct fuses in the
module referring to the value written on the label.
The predisposition of the correct mains voltage is performed in the following way:
EN
Connect mains cable to a mains outlet having good hearth connection.
OPERATION OF THE EQUIPMENT WITHOUT EARTH CONNECTION
The unit must be installed on a level surface, with dimension, at least, correspon-
dent to those of the base of the unit itself. Around the unit must be left a space
of 25cm, at least.
Connect the mains cable to the mains socket on the rear panel of the unit.
Connect, if request, the equipotential binding post located at the left of the unit's
back panel to eventual equipotential socket of the plant.
Connect the single foot switch to the connector on the front panel.
Connect handle on the buckle indicated "ACTIVE".
Let unit work in dry environment only. Any verified condensate must be let evap-
orate before putting in operation the unit. Don't exceed the temperature environ-
ment or the allowed moisture.
Condition environments:
Before using the unit, it is necessary connect the cable to the patient plate, and
these connected to unit. The neutral electrode must apply to patient (see Safety
chapter).
EN 12
(A-B) Extract the fuse holder drawer from the power module.
(C) Insert the fuses making reference to the following chart:
SURGERY PLUS
Mains Voltage
Mains Voltage
(D) Extract and rotate the detachable part in way to read the correct
voltage in the (E) window – reinsert the fuse holder in the module.
IS FORBIDDEN.
Temperature: 10/40°C
Relative moisture: 30/75%
Pressure: 70/106k Pa
110-120 V Delayed Fuse 2x T2 A / 5 x 20 mm
220-240 V Delayed Fuse 2x T1 A / 5 x 20 mm
MA505a_IT-EN-ES-FR-DE
Tabla de contenido
loading

Tabla de contenido