Kohler K-19537P Guia De Instalacion página 5

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1/8" (3 mm) -
2x4
1/2" (1.3 cm)
Brace
Elbow
Finished
Stud
Wall
1. Prepare the Site
Rough-in the Plumbing
NOTICE: For exterior wall installations, ensure proper wall
insulation to prevent frozen pipes.
Attach a 2x4 brace between two studs to support the supply lines.
The brace should be positioned so the face of the 1/2-14 NPT
supply elbows will be recessed 1/8" (3 mm) to 1/2" (1.3 cm)
within the finished wall.
NOTICE: Tile or stone covered walls may require an extension of
the supply line.
Position the supply lines 5-7/8" (14.9 cm) between the centerlines,
then attach a brass elbow to each supply line.
Verify the elbows are level with one another and the opened end
faces are recessed 1/8" (3 mm) to 1/2" (1.3 cm) behind the
planned finished wall surface.
Secure the elbows and supply lines to the 2x4.
Apply sealant tape to each pipe nipple.
Kohler Co.
5-7/8"
(14.9 cm)
Apply sealant tape.
2x4
Supply Lines
5
Pipe Nipple
Escutcheon
1084859-2-C
Tabla de contenido
loading

Tabla de contenido