Make Electrical Connections - Kohler K-1030-H2 Guia De Instalacion

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Both junction boxes
should be wired as shown.
Each requires a separate
supply.
Ground (Green with
Yellow Stripe)
Blue
Supply
Electrician to
provide suitable
strain relief

9. Make Electrical Connections

WARNING: Risk of electric shock. Make sure the power is disconnected before performing the
following procedures. Refer to the Important Information at the front of this manual.
WARNING: Risk of electric shock. Two 220-240V, 20A, 50/60Hz electrical services are required. Each
service must have a Ground-Fault Circuit-Interrupter (GFCI) or Earth-Leakage Circuit-Breaker (ELCB)
which will provide additional protection against line-to-ground shock hazard.
The controls and systems have been prewired at the factory. A licensed electrician should make a
routine service connection to both junction boxes located near the pump. One junction box is for the
pump and control system; the second is for the heater. Both boxes contain blue and brown wires
and an earth lug.
Use a 220-240 V, 20 A, 50/60 Hz dedicated service for the pump and control. Use a second 220-240
V, 20 A, 50/60 Hz dedicated service for the heater.
Provide a separate equipment earthing conductor for the inside earth lug. The earthing conductor
must not be connected to any current-carrying conductor. Follow local electrical codes.
NOTE: The wiring harness that connects the keypad to the control enclosure will be connected later.
1032120-2-C
Bond in accordance with
national and local codes.
Wire Connectors
From Control
or Heater
Brown
From Control
60 Hz 50 Hz
or Heater
L1
L1
Brown
L2
N
Blue
Pressure
Switch
Heater
Earth
Grounds
10
Keypad
Harness
Earth Grounds
Ground Wire
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-1035-h2K-1036-h2K-5161

Tabla de contenido