Porsche Wall Charger Connect Manual De Funcionamiento E Instrucciones De Instalación página 22

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Instructions
Switch position
Current value
US
8
16
7
12
FC
6
10
ESM
0, 1, 2, 3, 4, 5
not assigned
Switch position
DIP switch Net 1
OFF
ON
OFF
ON
1) For connection variant Delta High Leg, the switch should be set as follows: OFF/OFF (single phase) for connection to L1 - N and L2 - N, and ON/OFF (split phase) for connection to L1 - L2.
20
Setting the network configuration (Net)
To set the network configuration, there are two DIP
switches next to the terminals.
e Setting the network configuration using the DIP
switches.
The following overview contains the settings of the
DIP switches and the corresponding network
configuration.
DIP switch Net 2
Network configuration
OFF
120 V single phase
OFF
240 V split phase
ON
Wye 208 V
ON
not assigned
Details
1)
Two of the three connected phases are used
Switch combinations that are not permitted
Tabla de contenido
loading

Tabla de contenido