KitchenAid 720-0826E Instrucciones De Instalación Y Manual De Uso Y Cuidado página 36

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

10. Reinstall the four screws onto the rotisserie burner rear
cover.
11. Reinstall the rotisserie burner heat shield and tighten the
two screws.
12. Open the manual shutoff valve in the gas supply. The
valve is open when the handle is parallel to the gas pipe.
A.
Closed valve
B.
Open valve
13. Test all connections using an approved noncorrosive leak-
detection solution. Bubbles will show a leak. Correct any
leak found
Record Conversion
The LP appliance nameplate is located inside the grill cabinet
on the left-hand side. Once converted, place the NG appliance
nameplate as close as possible to the current LP appliance
nameplate without covering it.
In the last page of the Use and Care Guide, write "Converted to
Natural Gas". Also record the conversion date and the
technician/company that performed the conversion.
Adjust High Flame Setting Screw
When converting from LP to Natural gas, you will need to
adjust the high flame setting screw for ideal burner flame
height.
1.
Remove each control knob for the main burners and side
burner.
2.
Use a flat-blade screwdriver to turn the high flame
setscrew counterclockwise approximate 90º.
3.
Check that burner operates at the new high flame setting.
It may be necessary to adjust the screw setting slightly
more to get the ideal burner flame height.
4.
Place the burner control knobs back to their original
positions.
36
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

730-0826e

Tabla de contenido