GuTZZI direct flow Manual De Uso página 45

Equipos de ósmosis inversa
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

HOJA DEL REGISTRO DE INST
5. EQUIPMENT INSTALLATION AND INITIAL OPERATION REGISTRATION SHEET. TECHNICIAN
NOTES FOR TECHNICIAN/INSTALLER:
In the event of any queries please contact your distributor's Technical
Assistance Service (S.A.T.).
and copied to the WARRANTY SHEET.
This document should be retained by the installer/distributor as it may be
requested by IF/PEU/PAM, with the aim of improving customer and after sales
S/O
P/N
S/N
INFORMATION REGARDING THE EQUIPMENT'S APPLICATION:
Source of water to be treated:
Public water supply network.
Other networks:
*RO equipment prior treatment:
*RO equipment entry hardness [ºF]:
*RO equipment entry TDS [ppm]:
*RO equipment entry pressure [bar]:
RO equipment entry chlorine concentration [ppm]:
INSTALLATION PROCESS CONTROL:
Membrane assembly.
Sanitation in accordance with protocol.
Flow restrictor check.
Maximum pressure calibration.
Pressurized system water tightness check.
*TDS produced water (Work surface tap) [ppm]:
Clearly inform of the correct use and maintenance
required to ensure correct working of the equipment
and for the quality of the water produced. Given the
importance that correct equipment maintenance has
to ensure the quality of water to be produced, the owner
Please read this manual carefully.
45
COMMENTS
*Installation and initial operation results:
CORRECT (equipment installed and working
properly. Produced water is suitable for this application)
OTHER COMMENTS:
TECHNICIAN IDENTIFICATION
Company and/or installer, date and signature:
CONFORMITY OF EQUIPMENT OWNER:
I have been clearly informed regarding the correct use and
maintenance required for the installed equipment, and
informed of how to contact the Customer Service Depart-
ment in the event of wishing to make any information
requests, to report an equipment breakdown or malfunction,
or to request any technical services.
Comments:
*Ref. Maintenance contract:
The maintenance contract IS ACCEPTED.
The maintenance contract is NOT ACCEPTED.
Model / Ref.:
Owner, Mr/Mrs/Ms:
Street:
Telephone No:
Town/City:
State/County:
Post Code:
Date and signature:
Tabla de contenido
loading

Tabla de contenido