Installing The Machine; Checking The Scope Of Delivery - Ivoclar digital PrograMill Dry Instrucciones De Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

EN 12
5

Installing the machine

Checking the scope of delivery

Unpack the machine and ensure that you have
received the following items:
1
3
4
7
8
11
12
2
5
6
9
10
13
14
Operating Instructions: PrograMill Dry
Version: 2/19/2021
PrograMill Dry – Installing the machine
1. 1 x PrograMill Dry machine
2. 1 x Spindle service set
3. 1 x Power cable
4. 1 x USB cable
5. 1 x Key for the emergency release of the work-
ing chamber door
6. 1 x Pneumatic hose
7. 1 x Administrated tool board (ATB) in the
accessories container
8. 1 x Cleaning brush for the material holder
9. 1 x Crevice nozzle (for cleaning the working
chamber)
10. 1 x Compressed air regulator
11. 1 x Calibration set: 1 micrometer, 3 calibration
discs for manufacturing test and calibration
specimen, 1 radius cutter with 2 teeth (P200-
R2-40)
12. 1 x Measuring pin
13. 2 x Tool magazine inserts
14. 1 x Drill bit (2.8 mm) for tool positions
Not depicted:
This document
n
1 x Carrying aid for transporting the machine
n
1 x Transport lock in the working chamber
n
1 x Supplement about removing the carrying aid
n
and transport lock
4 x Spare screw for the tool magazine cover
n
Adapter connection to suction unit
n
Zirconium oxide tools
n
Keep the packaging of the machine, the carrying
aid and the transport lock for future transports.
Tabla de contenido
loading

Tabla de contenido