Assembly Procedure - Zodiac CADET ROLL UP 200 Manual Del Propietário

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

We recommend that you follow the specific order of the assembly procedure. Proceed step by step
and refer to the corresponding pages.
1. inventory the elements composing your boat,
and learn how to recognise them
2. activate valves in inflating position
3. slightly inflate the main buoyancy tube
4. CADET RU 200 - RU 240 : Insert the wooden slats in
their pockets
CADET RU 260 : install the rolling floor
CADET SOLID : assemble the floorboard
5. Install the seat (except CADET RU 200)
6. finish inflation of the boat to the correct pressure
7. Install the oars
CAUTION
The pack must contain: 1 buoyancy tube +
Cadet Roll up
Cadet Solid
Floorboard
inflatable keel
Stringer
Repair kit
Owner's manual (2)
Equipement standard
Removable wooden seat
Carry bag
Reinforced aluminium oar
Foot-pump
(1) S = Slats
R = Rolling floor
(2) 2 volumes
You can equip your boat with many optional accessories (transportation wheels, boarding ladder,
lifting rings etc.). Ask your dealer to advise you.
NOTICE :

ASSEMBLY PROCEDURE

PROCEDURE
CHECK ON UNPACKING
C200RU C240RU C260RU
S (1)
S (1)
1
1
1
1
1
1
1
2
2
1
1
PF = Marine Plywood Floor
IF YOU WISH TO ADD LIFTING RINGS, YOU MUST FIX THEM ON THE
BUOYANCY TUBE, NEVER ON THE FLOOR
PAGE
2
I - IV
6
7
3 - 5
9
7 - 8
9
DO NOT USE A SHARP TOOL
C260S
R (1)
PF (1)
1
2
1
1
1
1
1
1
1
1
2
2
1
1
/ 10
2
SECTION
CHECK ON UNPACKING
DESCRIPTION
INFLATION SYSTEM
INFLATION
ASSEMBLY
ASSEMBLY OF
EQUIPMENT
INFLATION / PRESSURE
ASSEMBLY OF
EQUIPMENT
C285S
C310S
C340S
PF (1)
PF (1)
PF (1)
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
1
2
1
1
1
1
2
1
Tabla de contenido
loading

Tabla de contenido