Playcore Swing-N-Slide PB 9242 Instrucciones De Ensamblaje página 38

Ocultar thumbs Ver también para Swing-N-Slide PB 9242:
Tabla de contenido
Assembly Plan
Fig. 31
Fig. 32
Surfacing
Material
2'' Below
Grade
Slide Installation.
NOTE:
If you received a Summit Slide with your kit, please follow the slide installation
instructions included with your slide.
1. Install Slide centered in the provided opening as shown in (Fig. 31).
2. Prepare a level area of ground where the bottom of the slide rests 2" below grade (Fig. 32).
3. Mark where the slide's bottom meets the ground and drive a 2" x 2" x 17" stake until its top is 2'' above the grade
prepared in Step 2. For reference, see (Fig. 31).
4. Attach Slide to Stake using (2) 30mm screws as shown in (Fig. 31).
2'' Above Grade
SLIDE STAKE
30mm Wood Screw
38
1'' Truss Screw
included with slide
Use truss head screws to
to secure slide to deck.
SLIDE SOLD
SEPARATELY
(2)
30mm screws
[PF 4338]
1-1/2'' x 1-1/2'' x 17''
Slide Stake
Tabla de contenido
loading

Tabla de contenido