Playcore Swing-N-Slide PB 9242 Instrucciones De Ensamblaje página 19

Ocultar thumbs Ver también para Swing-N-Slide PB 9242:
Tabla de contenido
Swing Beam Assembly.
1. Position Split-Brackets on 4'' x 4'' x 47-1/2''
(Fig 13).
2. With the help of others, lift A-Frame and
Swing Beam Assembly and center onto unit as
shown in (Fig. 13).
3. Secure as shown in (Fig 13a).
Fig. 13a
View from Deck
x 8 (each bracket)
2'' Lag screw
Fig. 13
19
Assembly Plan
Tabla de contenido
loading

Tabla de contenido