Commissioning
4.1 Commissioning
5. Press the <MENU> key.
6. Press the <Right Arrow> and then <ENT> to save the site data.
7. The flowmeter is now ready to report flow.
See also
Refer to I/O Connection Tables (Page 49) for input/output wiring and the Span Data manual
section for data spanning procedures.
40
14.35
354.6597
14.27
100.0
0.0
31.74
Operating Instructions, 7/2010, A5E03086486-02
FUS1010 IP65 NEMA 4X