Machine Foundation

NOTE: Do not mount on wooden floors, above
ground level, or over basements or crawl spaces
because of the high extract speed and the G-forces
exerted.
The floor must be 3500 psi minimum reinforced
concrete set firmly in clean, compacted fill dirt.
Models
2 Speed
(all capacities)
Variable-Speed
(35 – 50 pound)
Variable-
80 pound
Speed
125 pound
NOTE: For 80 and 125 pound models, a
bolt-locator fixture or rebar frame is available
as an option. This is designed to be embedded in
concrete. Refer to Figure 2.
IMPORTANT: Do not install any variable-speed
machine on an elevated base frame.
16
Machine Foundation Requirements
Foundation
Floor
Thickness
Thickness
4 in.
4 in.
(102 mm)
(102 mm)
6 in.
6 in.
(152 mm)
(152 mm)
9 in.
6 in.
(229 mm)
(152 mm)
12 in.
6 in.
(304 mm)
(152 mm)
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
The machine must be anchored to a smooth, level
surface so that the entire base of the machine is
supported and rests on the mounting surface. (Do not
support the machine on only four points.)
An elevated foundation must not exceed 8 inches
(20 cm).
Refer to Table 1 for foundation and anchoring
requirements.
Installation
Foundation
Method(s)
Direct-to-finished-floor,
elevated base frame, or
concrete foundation
Direct-to-finished-floor
or concrete foundation
Direct-to-finished-floor
or concrete foundation
Table 1
2
3
4
1
Machine Base
2
Mounting Bolt Threads
3
Grouting
4
Bolt-Locator Fixture or Rebar Frame
Anchoring
Anchoring
Method(s)
Diameter
Requirement
(minimum)
Expansion bolt
or J-bolt
J-bolt or
mounting bolt
J-bolt, mounting
bolt, or rebar
frame
1
P035I
Figure 2
Bolt
Size
5/8 in.
5/8 in.
3/4 in.
P035I
F232135