Wiring The Hood With An Integral Blower; Remote Blower Installation; Wiring The Hood With A Remote Blower - Thermador PH Professional Serie Manual De Instalación

Ocultar thumbs Ver también para PH Professional Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Wiring the Hood with an
Integral Blower
1. Integral Blower models VTN630C and VTN1030C are
designed to work with the PH hoods and are sold
separately.
2. Remove the j-box cover.
3. Connect the blower's Molex plug connector to the
connector present inside the hood as shown in
Figure 19.
4. Install 1/2" conduit connector in j-box.
From Control Panel
Figure 19: Wiring the Hood with an Integral Blower
5. Run black, white, and green wires (#12 AWG) in 1/2"
conduit from power supply to J-box.
6. Connect the power supply wires to the hood wires in
the following order: black to black, white to white, and
green wire to green ground screw on chassis. Use
spring type wire nuts supplied. (Lost or missing wire
nuts should only be replaced with: Spring type wire
nuts rated for a minimum of two (2) # 18ga wires and
maximum of four (4) #14ga wires, UL & CSA rated to
600V and 302° F./150° C.)
7. Close J-box cover. Check to see that light bulbs are
secure in their sockets. Replace filters as described in
the Care & Use Manual. Turn power on at service
panel. Check operation of the hood.

Remote Blower Installation

The PH hood models are designed to work with VTR630D,
VTR1030D, or VTR1330E remote blowers. For installation
instructions see the instructions supplied with the blower
unit.
English 12
From Blower
Wiring the Hood with a
Remote Blower
RED — LOW
SPEED
BLUE — MEDIUM
SPEED
BLACK — HIGH
SPEED
(included w/ hood)
Figure 20: Wiring the Hood with a Remote Blower
1. Remove the J-box cover.
2. Install 1/2" conduit connectors.
3. Run black, white, and green wires (#12 AWG) in 1/2"
conduit from power supply to j-box.
4. Connect the power supply wires to the hood wires in
the following order: black to black, white to white, and
green wire to green ground screw on chassis. Use
spring type wire nuts supplied. (Lost or missing wire
nuts should only be replaced with: Spring type wire
nuts, rated for a minimum of (2) # 18ga wires and
maximum of (4) #14ga wires, UL & CSA rated to 600V
and 302° F./150° C).
5. Connect the "pigtail" to the connector inside the
junction box.
6. Run five (5) wires (#14 AWG) in 1/2" conduit from the
remote blower to the second conduit connector.
7. Connect the remote ventilator to the pigtail wires (Step
6) as per Figure 20. Connect the remote blower green
(ground) wire to the ground screw in the junction box.
8. Close junction box cover. Check that all light bulbs are
secure in their sockets. Install filters. Turn power on at
service panel, and check lights and blower operation
per Care & Use Manual.
WHITE —
NEUTRAL
PIG TAIL ASM
Tabla de contenido
loading

Tabla de contenido