Installation; Electrical Connection; Water Connection; Loading Heights - WAGNER PlastMix 15 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
GB
4

INSTALLATION

Position the mixer on a flat surface in a suitably ventilated en-
vironment where it does not constitute an obstruction either
during use or cleaning at the end of the work shift.
- Position the mixer on a flat surface or slightly inclined towards
the material outlet.
- Set up the mixer so that no liquids (e.g. rain) can get into the
funnel.
4.1

ELECTRICAL CONNECTION

Check that the supply voltage, mains fre-
quency and power connection (socket,
fuses, cable) correspond to the information
on the rating plate.
The electrical power socket must be fitted with protection
against current overload (e.g. by means of fuses or a thermal
magnetic cut-out) and against dispersion current to earth (e.g.
with a differential circuit breaker). The electric cable wire size
must take into account the operating currents and length of
the line to avoid excessive voltage drops.
Always completely unwind cable reels that are in use. The power
cable must be suitable for frequent movements and with an
abrasion resistant sheath (e.g. type H07RN-F).
Before connecting the mixer to the electrical mains, ensure that
all safety devices are fitted and are in perfect condition. Check
that the extension cable is in a good condition and that the
sockets and plugs are dry.
Connect the mixer socket on the electrical panel to the mains
(fig.5).
20
4.2

WATER CONNECTION

Connect the water hose to the water mains.
The water system must be able to ensure a delivery rate of at
least 20 l/min and a minimum pressure of 2 bar.
If the supply of water is not sufficient, use the
pump which can be purchased as an accesso-
ry (please contact Wagner Service).
4.3

LOADING HEIGHTS

The PlastMix 15 continuous mixer can be operated at three
different heights. The feet can slide within the frame before
being locked in position with the split pins at set heights, to
enable three different loading heights (fig. 6):
1) Direct loading of material into PlastCoat type plaster mixer
2) Direct loading of material onto trolley
3) Direct loading of materials into work bucket.
1
2
3
PlastMix 15
1
2
3
1
2
3
Tabla de contenido
loading

Tabla de contenido