Dolmar SP-7650.4 R Manual De Instrucciones página 12

Ocultar thumbs Ver también para SP-7650.4 R:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 137
4. Set two of 76 mm diameter bands (3) on the pipe loosely (those bands are used for
tightening the solution discharge lever and tube joint later).
Assemble the second nozzle (11) with straight pipe.
Tighten them with another 76 mm diameter band (3).
5. Put the solution discharge lever (12) onto the pipe.
Make sure that the open side of the lever's base (13) faces the swivel pipe.
Align the lever's base with the gap of the projection on the straight pipe (14).
Then tighten them with the 76 mm diameter bands (3).
6. Make sure all clamps are tight.
Adjusting and securing the control handle
1. Put the machine on your back and adjust the shoulder strap (see "Adjusting the
shoulder strap").
2. Slide the control handle (1) along the tube to the most comfortable position.
3. Secure the control handle by turning the knob (2).
Installing the end pipe (optional accessory for blower
operation)
WARNING:
Drain all chemical solution from the solution hose (1) and tube joint (2), and make
sure the solution discharge lever (3) is closed before installing the end pipe.
Otherwise chemical solution may be spilled out.
1. Remove the solution hose from the tube joint by loosening the hose band.
2. Remove the 76 mm band, and remove the second nozzle from the straight pipe.
(13)
12
(3)
(3)
(12)
(14)
(3)
(1)
(3)
(1)
(2)
(11)
(2)
Tabla de contenido

Solución de problemas

loading

Tabla de contenido