Deflating The Mattress - GETINGE GROUP Arjohuntleigh NIMBUS 3 Instrucciones De Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 167
If the Power Fail Alarm does not operate after this test and a service
engineer has been called, the pump can continue to be used with regular
checks of the Power-On status.
All other alarms will continue to function as normal.
Deflating the
Mattress
Make sure the mattress is dry before rolling it up.
The battery may have become discharged or reached the
end of its life. It is therefore recommended that the alarm
is tested before the pump is used, as follows.
1. Connect the pump to the mains power supply,
switch
and allow it to run for 10-15 seconds.
ON
2. Remove the mains power at the wall socket without
switching the pump off.
3. The power fail alarm should operate within 10
seconds, as follows:
• The red
Alarm
• The
POWER
• An audible warning will sound.
4. The alarm will continue until the mains power is
resumed or the pump is switched off using the
switch on the pump control panel.
POWER
5. If the alarm does not operate, run the pump for
approximately four hours to recharge the battery.
6. Retest the alarm after the battery has been
recharged. Allow the alarm to operate for
approximately two minutes to ensure that it has
been adequately recharged.
7. If the alarm does not operate for two minutes, call
the service engineer.
To deflate and store the mattress, do the following:
1. Switch off the pump, and disconnect the pump from
the mains power supply.
2. Remove the tubeset from the pump and mattress
(Refer to "Disconnecting the Tubeset" on page 10).
3. Activate the CPR control.
4. Make sure the Transport control is set to
5. Roll up the mattress, starting at the foot end.
17
triangle will flash.
indicator will flash.
NORMAL.
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Arjohuntleigh nimbus 3 professional

Tabla de contenido