Siemens RVL481 Instrucciones De Montaje página 40

Ocultar thumbs Ver también para RVL481:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 284
4. Push lateral tongues behind the front panel (refer to illustration).
5. Wire up base. Make sure the cable lengths are such that there is sufficient space to open
the control panel door.
en
Wrong
Commissioning
Preparatory checks
1. DO NOT switch on power yet.
2. Check wiring according to the plant connection diagram.
3. Ensure correct position and location of levers by turning the fixing screws. Refer to illus-
tration on the lateral wall of the controller:
4. Insert unit in the base until stop is reached. Marking TOP must be at the top!
5. Tighten fixing screws alternately.
6. Check controlling element (seat or slipper valve): See if
Building Technologies
Place tongues correctly – they
may not be inside the cutout!
Correct
74 319 0618 0 a
17.04.2008
40/326
Tabla de contenido
loading

Tabla de contenido