Mounting After Maintenance - Husqvarna WSC 40 Manual De Instrucciones

Ocultar thumbs Ver también para WSC 40:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Mounting after maintenance

1
Place the drive sprocket on the output shaft.
2
Assemble according to the illustration.
1
3
Tighten the 2 countersunk screws (1) with tightening
torque 20 Nm.
22 – English
MAINTENANCE
4
Place the chain on the chain bar and make sure that
the chain follows the nose sprockets and the drive
sprockets carefully.
5
When the drive sprocket has been loosen the screw,
threads and bolt head must be greased. If the screw
is not properly greased it will loosen. Always tighten
the screw with tightening torque 20 Nm (15 ft-lbs).
6
Use the twisting knob to adjust the chain tension.
Check the chain tension. Tighten the clamping washer
with the bolt. Use tightening torque 20 Nm (15 ft-lbs).
7
Replace the cover. Tighten the knob carefully by hand.
Tabla de contenido
loading

Tabla de contenido