8. Check:
Checking steps:
• Turn the shift lever to the neutral position.
• Fully open and close the throttle several
• Check that the throttle valve fully opens
9. Connect:
1
NOTE:
Fasten the wiring harness coupler at the plas-
tic tie.
10. Install:
NOTE:
After secure the fitting plate, lift the tiller handle
straight up and check that the cables and wires
are not stretched.
67
• Throttle operation
Unsmooth operation → Adjust.
times.
and closes.
• Warning indicator lead coupler 1
• Wiring harness coupler 2
• Fitting plate 1
• Bolts 2
Bolt:
8.0 N • m (0.82 kgf • m, 5.9 ft • lb)
(For F50A, FT50B, FT50C, and
F50D)
10.0 N • m
(1.02 kgf • m, 7.4 ft • lb)
(For F40C, F60A, and FT60B)
E