Mitsubishi Electric CITY MULTI PEFY-P54NMAU-E4 Manual De Instalación página 4

Ocultar thumbs Ver también para CITY MULTI PEFY-P54NMAU-E4:
Idiomas disponibles

Idiomas disponibles

7
[Fig. 7.1.1]
[Fig. 7.1.2]
A
[Fig. 7.2.1]
Max. 20 m [65 ft]
1.5-2 m [5-7 ft]
B
A
K
B
D
E
F
F
H
[Fig. 7.2.2]
E
A
35
32
25
H
[1-
13
/
]
[1-
1
/
]
[1]
32
4
B
C
D
D
A Indoor unit
B Tie band (accessory)
C Visible part
D Insertion margin
E Drain hose (accessory)
F Drain pipe (O.D. ø32 mm [1-1/4 in] PVC TUBE, field supply)
G Insulating material (field supply)
H Tie band (accessory)
4
A Cut here
B Remove brazed cap
A Cool by a wet cloth
C
L
M
D
D
F
G
I
(Unit: mm [in])
F
G
7.1
[Fig. 7.1.3]
A
B
A
D
7.2
13
Max. 300 mm [11-
/
16
in]
N
B
J
F
O
C
A Thermal insulation
B Pull out insulation
C Wrap with damp cloth
D Return to original position
E Ensure that there is no gap here
F Wrap with insulating tape
E
F
○ Correct piping
× Wrong piping
A Insulation (9 mm [3/8 in] or more)
B Downward slope (1/100 or more)
C Support metal
K Air bleeder
L Raised
M Odor trap
Grouped piping
D O. D. ø32 mm [1-1/4 in] PVC TUBE
E Make it as large as possible. About 10 cm [3-15/16 in].
F Indoor unit
G Make the piping size large for grouped piping.
H Downward slope (1/100 or more)
I O. D. ø38 mm [1-1/2 in] PVC TUBE for grouped piping.
(9 mm [3/8 in] or more insulation)
J Up to 700 mm [27-9/16 in]
N Drain hose (accessory)
O Horizontal or slightly upgradient
loading