stEp 2 – INITILIZATION (70 Seconds): Pumps will automati-
cally start after the Reservoir has been filled, transporting water
from the Reservoir to the Boiler. When Boiler is full, any exces-
sive water will be expelled into waste bin.
WARNING: If Brewer does not expel water into
the Capsule Drawer, turn the Brewer OFF imme-
diately to avoid permanent damage to the Boiler
and call service.
stEp 3 – HEATING (120 Seconds): Pumps will stop and the
Brewer will switch over to heat the Boiler and the screen will
read "HEATING".
Discard any liquid from the capsule drawer at this time.
If "Heating" remains for over 3 minutes, turn the brewer OFF
and call service.
When boiler has reached programmed temperature, the main
screen appears, and the brewer is ready.
5. OPERATIONS
CAUTION! This brewer contains a boiler that keeps water at 200°F (93°C) at all
times, and produces hot liquids that may cause injury from scalding. Keep
away from children at any time
HOW TO ADJUST CUP TRAY HEIGHT
-
Hold the cup tray with one hand.
-
With the other hand, reach underneath the cup holder and
pull the knob to unlock the tray
-
Move the tray up or down to fit cup
-
Release to lock tray in position.
HOW TO BREW COFFEE
-
Lift lid open and lay a new coffee capsule in the slot. do not
push the old capsule down by hand or force the new
capsule in if too hard.
WARNING: Check orientation of capsule follow-
ing the molding's shape.
HEATING
PLEASE WAIT
COFFEE
TEA
WATER
9