EN
3e. Installation of the cell and the mechanical flow switch
Flow
switch
Probe holder
Installation and connection of the cell (see diagram):
•
Install the cell mount horizontally.
•
Install the cell in a bypass.
•
Connect the power cable to the underside of the control box.
Installation and connection of the mechanical flow switch:
•
Install the flow switch mount (part A) before the cell and on the bypass.
•
Unscrew the white protective cover of the mechanical flow switch.
•
Screw the ¾" fitting onto the flow switch.
•
Put the ¾" O-ring supplied with the kit in place.
•
Screw the flow switch onto its mount.
•
Connect the red and black cable to the electronic circuit board terminals A
and C
AquaRite
®
Only use spare parts supplied by Hayward brands ®
Tcell S3
Pro Touch
Page 8 on 16