Dacor DOP48C86D Serie Instrucciones De Instalación página 24

Ocultar thumbs Ver también para DOP48C86D Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Instructions
Installing the Flexible Conduit
Remove the conduit connection plate from the rear of the drawer body, and flip it as shown. (Use the 1⅛" hole.)
1. Prepare the conduit cord (Figure 1).
2. Install the conduit cord (Figure 2).
Conduit installations: Insert the strain relief (not included) in the 1⅛"conduit hole, thread the conduit cord through
the body of the strain relief, and fasten the ring, then reinstall the bracket.
Installing a 3-wire Conduit
Aluminum building wire may be used but must be rated for the correct amperage and voltage. Connect wires
according to Step 4 depending on the number of wires.
Wire used, location/enclosure of splices, etc., must follow good wiring practices and local codes.
Neutral terminal
Black
Black
24
English
INSTALL_DOP36C86DLS_DA_DG68-01510A.indb 24
INSTALL_DOP36C86DLS_DA_DG68-01510A.indb 24
Figure 1
1"
⅜"
1"
⅜"
3½"
3½"
3 wire
4 wire
Knockout surface
Conduit connection plate
Ground strap
White
Red
White
Red
Wire tips
1⅛"
1⅜"
Strain relief
1.
Loosen the three lower screws on the terminal block.
2.
Insert the white/neutral bare wire tip through the
bottom-center block opening. (Some models: the wire
inserted through the ground-strap opening into the
bottom-center block opening.)
3.
Insert the left and right wire tips into their
respective block openings.
4.
Tighten the screws to 35 – 50 in.-lbs.
(Any tighter may damage the wires.)
1⅜"
1⅛"
Figure 2
Ring
Body
2023-02-23 오전 9:57:50
2023-02-23 오전 9:57:50
Tabla de contenido
loading

Este manual también es adecuado para:

Dop36c86d serie

Tabla de contenido