Installation Of The Draining Systems; V-3-1-Description Of The Essential Functional Elements; Draining Of Water From The Deck - Zodiac MEDLINE 7.5 Manual De Instrucciones

Ocultar thumbs Ver también para MEDLINE 7.5:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

V-3 INSTALLATION OF THE DRAINING SYSTEMS

V-3-1-Description of the essential functional elements

3
1
4
Ref.
1
Engine recess drain
2
Hull scupper
3
Bilge pump outlet
4
Bilge pump
5
High flow rate self-bailer with non-return valve
6
Drain pipes
7
Scuppers
V-3-2 Draining of water from the deck
The boat is self-draining, with a rainwater drainage system:
2 scuppers on the deck, one forward of the console and a second forward of the bolster.
Both are connected to a scupper that passes through the hull.
INSTALLATION AND CIRCUIT - DRAINING
5
6
7
DESCRIPTION
Page 39 / 55
1
5
2
6
6
Issue 1
E
N
G
L
I
S
H
Tabla de contenido
loading

Tabla de contenido