Submerged Installation Of The Pump; Dry Installation Of The Pump - Oase AquaMax Eco Titanium 31000 Instrucciones De Uso

Ocultar thumbs Ver también para AquaMax Eco Titanium 31000:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 82

Submerged installation of the pump

• Ensure that the power cables and mains sockets are at least 2 m from the water.
• For installation of the pump in a pump chamber (recommended):
– For a swimming pond or pool frequented by swimming people, install the pump chamber at
least 2 m from the water.
– Install the pump horizontally.
– Screw the stand to the floor of the pump chamber to ensure the stability of the pump.
• For installation of the pump without a pump chamber:
– Place the pump horizontally on a stable, mud-free surface.
– Ensure secure and stable positioning of the pump.
• Only operate the pump when it is fully submerged.
• Pool water or salt water can impair the appearance of the unit. Such impairments are excluded
from the guarantee.

Dry installation of the pump

• Ensure that the power cables and mains sockets are at least 2 m from the water.
• For a swimming pond or pool frequented by swimming people, install the pump at least 2 m
from the water.
• Place the pump horizontally on a stable surface.
• Ensure secure and stable positioning of the pump. If necessary, screw the stand to the ground.
• Protect the pump from direct sunlight.
• Adhere to the maximum permissible ambient temperature. If necessary, provide forced cool-
ing. (→ Technical data)
EN
AMX0063
AMX0037
31
Tabla de contenido
loading

Este manual también es adecuado para:

Aquamax eco titanium 51000Aquamax eco titanium 81000

Tabla de contenido