GRE KOV4870NE Manual Del Usuario página 12

Tabla de contenido
EN
PARTIAL OR COMPLETELY IN-GROUND INSTALLATION
Bedding: (S) ( Concrete):
When the excavation is level, lay the concrete bedding for the pool.
We recommend to ask a professional to prepare the foundation slab.
The concrete slab is not included.
Dosing 350 kg/m
(standardized type C125 430)
3
L: 7,00 x W: 4,30 x H: 0,15 m - 4,51 m3 concrete.
L: 5,40 x W: 3,80 x H: 0,15 m - 3,07 m3 concrete.
CAUTION:
Check that the surface is perfectly level and smooth. Any
imperfection in the bedding will be visible when the pool
is filled with water.
Before pouring the concrete, the structural system
(columns and internal structure, beams) should be
perfectly levelled)
After building the structure, the framework can be placed
over it.
Make sure that the structure is well fixed to avoid its
movement when pouring the concrete. The base of the
structure should be completely covered, with 2 cm of
concrete over the PEAO base.
If you are going to use a concrete slab, the flanges should
not be installed (AP).
12
Tabla de contenido
loading

Este manual también es adecuado para:

Kov6270ne

Tabla de contenido