Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5. Commissioning, operation

5.1.4 Magnet installation

Remove the keeper from the magnet and discard. Check surface of magnet for any debris.
Place the magnet onto the vessel surface at the middle of the cavity.
EN
5.1.5 Insulation packing
The top of the magnet must be packed with insulation under the cladding. Using a high-
®
temperature fiber blanket, e.g. Kaowool
, lightly pack the top of the magnet around the
stem.
16
WIKA operating instructions model TC52-M
Tabla de contenido
loading

Tabla de contenido